Ten stages, and you always know which one you are in

Interior projects go wrong when nobody can say what happens next. Every stage below has a deliverable, a duration and a named person responsible for it.

Stages
10 from call to keys
Design phase
~3 weeks
Execution
30 — 90 days
Revisions
2 rounds included

The process

From first call to final handover

Durations below are typical for a 3BHK. Smaller scopes compress; villas and commercial fit-outs extend.

  1. 01Day 1

    Consultation

    We start with what you actually need and what you are willing to spend. No drawings yet — this call exists to establish whether the budget and the brief can meet in the middle before anyone invests time.

    • Requirement summary
    • Indicative budget band
    • Realistic timeline
  2. 02Day 2 — 4

    Site Visit & Measurement

    Our team measures every wall, checks plumb and level, records beam drops, electrical points, plumbing positions and window openings. Builder drawings are treated as a reference, never as fact.

    • Measured drawing set
    • Site condition report
    • Structural constraint notes
  3. 03Day 5 — 14

    Design & 3D Visualisation

    Layout options first, then material direction, then photorealistic 3D renders of every room. You get revision rounds until the render is genuinely the home you want to live in.

    • 2D layout options
    • Photorealistic 3D renders
    • Two revision rounds included
  4. 04Day 12 — 18

    Material Selection

    You handle the actual laminate, veneer, quartz and hardware. Screens lie about colour and nothing replaces feeling a shutter finish before committing to sixty of them.

    • Sample presentation
    • Approved material schedule
    • Brand and grade confirmation
  5. 05Day 18 — 21

    Detailed Quotation

    Every unit is quoted by dimension, material and finish. You can see exactly what a wardrobe costs and remove it if you want to. No lump sums, no vague allowances.

    • Itemised BOQ
    • Payment schedule
    • Written scope of work
  6. 06Day 21 — 25

    Customer Approval

    Design, specification and cost are frozen at this point. Changes after sign-off are possible but are quoted separately, which keeps the project honest for everyone.

    • Signed design set
    • Signed BOQ
    • Confirmed production start date
  7. 07Day 25 — 55

    Manufacturing

    Panels are machine-cut and edge-banded to a fraction of a millimetre in a controlled workshop. Factory production means better tolerances, less on-site dust and a far shorter installation window.

    • Production tracking updates
    • Quality checks at each stage
    • Pre-dispatch inspection
  8. 08Day 55 — 75

    Installation

    Civil, electrical, ceiling, flooring, joinery and painting run in the right order under one project manager. Your floors and existing finishes are protected throughout.

    • Weekly progress report
    • Named site supervisor
    • Daily site cleaning
  9. 09Day 75 — 80

    Quality Inspection

    Alignment, shutter gaps, drawer travel, switch function, paint finish and hardware operation are each checked against a standard list. Anything that fails is rectified before handover, not after.

    • Inspection checklist
    • Snag list and rectification
    • Joint client walkthrough
  10. 10Day 80 — 85

    Final Handover

    You receive warranty certificates, material specifications, care instructions and your service contact. The relationship continues into the warranty period rather than ending at the door.

    • Warranty certificates
    • Care & maintenance guide
    • Dedicated service contact

The complete journey

What the whole relationship looks like

From the first page you land on to the service call three years later.

01Explore services
02View portfolio
03Calculate or ask price
04Book consultation
05Site visit
06Design
07Quotation
08Approval
09Execution
10Handover
11Warranty & support

Warranty & after-sales

What is covered, and for how long

Handed to you on paper at handover, with the hardware warranty registered in your name directly with the manufacturer.

Product Warranty

Up to 10 years

Manufacturing defects on all factory-produced joinery — carcass, shutters, edge banding and structural integrity.

Installation Warranty

Up to 5 years

Workmanship on fitting, alignment, levelling and fixing. If an installed unit moves or sags, we return and correct it.

Hardware Warranty

Up to 10 years

Branded hinges, channels, lift-ups and pull-outs, covered directly under the manufacturer warranty we register in your name.

Service Support

Lifetime

A named service contact for the life of the interior. Paid maintenance visits remain available after the warranty period ends.

Raising a service request

Warranty work is free and scheduled without argument. Anything outside warranty is assessed and quoted before we touch it.

01

Raise a request

Call, WhatsApp or use the contact form with your project reference.

02

Same-day acknowledgement

We confirm receipt and log the issue against your project file.

03

Assessment within 48 hours

A technician inspects on site or via photos, depending on the issue.

04

Resolution scheduled

Warranty work is scheduled free of charge; anything outside warranty is quoted first.

Free site visit

Book a visit. Get a real number.

Our team measures your space, listens to what you actually want, and gives you an itemised quotation. No charge, and no obligation to proceed.

  • Free site visit and laser measurement
  • Itemised quotation, no lump sums
  • Honest timeline before you commit

Prefer to talk first? +91 98765 43210 or message us on WhatsApp.