Our process
Interior projects go wrong when nobody can say what happens next. Every stage below has a deliverable, a duration and a named person responsible for it.
- Stages
- 10 from call to keys
- Design phase
- ~3 weeks
- Execution
- 30 — 90 days
- Revisions
- 2 rounds included
The process
From first call to final handover
Durations below are typical for a 3BHK. Smaller scopes compress; villas and commercial fit-outs extend.
- 01Day 1
Consultation
We start with what you actually need and what you are willing to spend. No drawings yet — this call exists to establish whether the budget and the brief can meet in the middle before anyone invests time.
- Requirement summary
- Indicative budget band
- Realistic timeline
- 02Day 2 — 4
Site Visit & Measurement
Our team measures every wall, checks plumb and level, records beam drops, electrical points, plumbing positions and window openings. Builder drawings are treated as a reference, never as fact.
- Measured drawing set
- Site condition report
- Structural constraint notes
- 03Day 5 — 14
Design & 3D Visualisation
Layout options first, then material direction, then photorealistic 3D renders of every room. You get revision rounds until the render is genuinely the home you want to live in.
- 2D layout options
- Photorealistic 3D renders
- Two revision rounds included
- 04Day 12 — 18
Material Selection
You handle the actual laminate, veneer, quartz and hardware. Screens lie about colour and nothing replaces feeling a shutter finish before committing to sixty of them.
- Sample presentation
- Approved material schedule
- Brand and grade confirmation
- 05Day 18 — 21
Detailed Quotation
Every unit is quoted by dimension, material and finish. You can see exactly what a wardrobe costs and remove it if you want to. No lump sums, no vague allowances.
- Itemised BOQ
- Payment schedule
- Written scope of work
- 06Day 21 — 25
Customer Approval
Design, specification and cost are frozen at this point. Changes after sign-off are possible but are quoted separately, which keeps the project honest for everyone.
- Signed design set
- Signed BOQ
- Confirmed production start date
- 07Day 25 — 55
Manufacturing
Panels are machine-cut and edge-banded to a fraction of a millimetre in a controlled workshop. Factory production means better tolerances, less on-site dust and a far shorter installation window.
- Production tracking updates
- Quality checks at each stage
- Pre-dispatch inspection
- 08Day 55 — 75
Installation
Civil, electrical, ceiling, flooring, joinery and painting run in the right order under one project manager. Your floors and existing finishes are protected throughout.
- Weekly progress report
- Named site supervisor
- Daily site cleaning
- 09Day 75 — 80
Quality Inspection
Alignment, shutter gaps, drawer travel, switch function, paint finish and hardware operation are each checked against a standard list. Anything that fails is rectified before handover, not after.
- Inspection checklist
- Snag list and rectification
- Joint client walkthrough
- 10Day 80 — 85
Final Handover
You receive warranty certificates, material specifications, care instructions and your service contact. The relationship continues into the warranty period rather than ending at the door.
- Warranty certificates
- Care & maintenance guide
- Dedicated service contact
The complete journey
What the whole relationship looks like
From the first page you land on to the service call three years later.
Warranty & after-sales
What is covered, and for how long
Handed to you on paper at handover, with the hardware warranty registered in your name directly with the manufacturer.
Product Warranty
Up to 10 years
Manufacturing defects on all factory-produced joinery — carcass, shutters, edge banding and structural integrity.
Installation Warranty
Up to 5 years
Workmanship on fitting, alignment, levelling and fixing. If an installed unit moves or sags, we return and correct it.
Hardware Warranty
Up to 10 years
Branded hinges, channels, lift-ups and pull-outs, covered directly under the manufacturer warranty we register in your name.
Service Support
Lifetime
A named service contact for the life of the interior. Paid maintenance visits remain available after the warranty period ends.
Raising a service request
Warranty work is free and scheduled without argument. Anything outside warranty is assessed and quoted before we touch it.
Raise a request
Call, WhatsApp or use the contact form with your project reference.
Same-day acknowledgement
We confirm receipt and log the issue against your project file.
Assessment within 48 hours
A technician inspects on site or via photos, depending on the issue.
Resolution scheduled
Warranty work is scheduled free of charge; anything outside warranty is quoted first.

Free site visit
Book a visit. Get a real number.
Our team measures your space, listens to what you actually want, and gives you an itemised quotation. No charge, and no obligation to proceed.
- Free site visit and laser measurement
- Itemised quotation, no lump sums
- Honest timeline before you commit